I decided that I needed a cleaner look in the sewing room. So I moved all the bolts of fabric to the garage, second floor.
That was a very big job for me but it is done now and I am enjoying breathing room. It's also very clean, dust was every surface due to the bathroom Reno.
I have also been working on a rug for my new bathroom. As soon as something is placed on the floor, my inspectors start examining the item.. Well Lucy approved.
Each layer of rope adds a 1/4 inch so it's slow going, but I think it will be worth it. I also quilted a baby quilt late this afternoon. I'll post it tomorrow.
Friday I quilted the eye fooler quilt and made and attached the binding. Can you guess what I'll be doing in the evenings? It has to get done so...
Frog Quilter